1、机组预热:
1.Unit preheating:
1)检查机组各系统存在的安全隐患,按规定程序操作,按必要的技术要求进行机组预热;
1)Check the safety hazards in the unit system,operate according to the prescribed procedures,and preheat the unit according to the necessary technical requirements;
2)把发电机组的油温控制在80℃以上,然后慢慢调节进入90℃以上,维持预热时间不少于15分钟;
2)The oil temperature of the generator set should be controlled above 80 C,and then slowly adjusted to above 90 C,and the preheating time should not be less than 15 minutes;
3)把机油滤网清洗更换,更换机组滤清器;
3)Clean and replace the oil filter and replace the filter of the unit;
4)把机组内有关器件,安装部件进行检查,确保牢固;
4)Check the relevant components and installation components in the unit to ensure firmness;
5)把机组发电机组各系统故障记录表填写完整,按规定要求进行检查;
5)Fill in the fault record table of all systems of the generator set of the unit and check according to the requirements;
6)把机组发电机组各系统故障记录表填写完整,按规定要求进行检查。
6)Fill in the fault record table of all systems of the generator set of the unit and check according to the requirements.
2、机组磨合:
2.Unit running-in:
1)机组启动时,先把机组发电机组转速控制在1800-2000转/分钟,维持10分钟以上,把发动机油温调节在90℃-95℃之间;
1)When the unit starts,the speed of the generator set of the unit is first controlled between 1800-2000 rpm,and the engine oil temperature is adjusted between 90 C-95 C for more than 10 minutes;
2)发动机运行5小时以上,然后把发动机转速控制在1500-1800转/分钟,维持10分钟以上,把发动机油温调节在90℃-95℃之间;
2)The engine runs for more than 5 hours,then the speed of the engine is controlled between 1500-1800 rpm,and the engine oil temperature is adjusted between 90 C-95 C for more than 10 minutes;
3)发动机运行10小时以上,然后把发动机转速控制在1000-1500转/分钟,维持10分钟以上,把发动机油温调节在90℃-95℃之间;
3)The engine runs for more than 10 hours,then the speed of the engine is controlled between 1000-1500 rpm,and the engine oil temperature is adjusted between 90 C-95 C for more than 10 minutes;
4)发动机运行20小时以上,然后把发动机转速控制在700-1000转/分钟,维持10分钟以上,把发动机油温调节在90℃-95℃之间;
4)The engine runs for more than 20 hours,then the speed of the engine is controlled between 700-1000 rpm,and the engine oil temperature is adjusted between 90 C-95 C for more than 10 minutes;
5)发动机运行30小时以上,可正常运行,磨合完毕,完成正常投入使用。
5)After the engine runs for more than 30 hours,it can run normally and the running-in is finished,and it can be put into normal use.